11/12/09 View looking north from the south end zone
(goal posts will be straightened when field is completed)
|
|
|
|
11/12/09 view of the track, looking south towards the school
(application of rubberized red surface and striping remains)
|
|
|
|
11/12/09 Workmen putting down yard line numbers on new field
|
|
|
|
11/19/09 Piers have been poured to support the bleachers
|
|
|
|
11/19/09 Workmen spelling out GAINESVILLE in the north endzone
|
|
|
|
|
12/14/09 Fence posts have been set for the new, black interior fence
|
|
|
|
12/14/09 The playing field has been completed and the Gainesville "G" added at midfield
|
|
|
|
Exterior fencing around the stadium is just about complete. 12/27/09
|
|
|
|
Workmen installing the structural support framework for the home bleachers 1/17/10
|
|
|
|
View from across the field of progress on the home bleachers. The field is covered in white plastic to protect it from overspray 1/17/10.
.
|
|
|
|
|
2/5/10 Worker paints symbols on the new track.
|
|
|
|
2/5/10 The new 8-lane track is almost complete
|
|
|
|
2/5/10 Home side bleachers (pressbox not yet installed)
|
|
|
|
2/5/10 Visitors side bleachers with small pressbox for coaches
|
|
|
|
4/1/10 A crane lifts the new pressbox into place.
|
|
|
|
|
4/1/10 view of the new pressbox in place, still attached to crane.
|
|
|